You are here

Riber M7 Ready within the Next Month

Originally Published March 2016

Another MBE chamber is about to be open for business within SEAL.  A prototype, Riber M7,  MBE will be ready for growth within the next month.  This system is currently equipped with an oxygen plasma source as well as high purity gallium, iron and a rod fed platinum e-beam source.  Initial research is geared toward exploration of advanced wide bandgap Ga2O3 semiconductors as well as Fe / Pt - magnetic epilayers with integrated Pt spin detectors for thermal spintronics.  Additionally, this chamber is connected in vacuum via a magnetic transfer system to another MBE chamber which grows plasma assisted nitrogen based semiconductors allowing integration of these materials without exposure to atmospheric conditions.  

Contact Mark Brenner for further info (Brenner.34@osu.edu). 

Riber M7 MBE chamber within the SEAL facility.