You are here

Riber M7 Ready within the Next Month

Originally Published March 2016

Another MBE chamber is about to be open for business within SEAL.  A prototype, Riber M7,  MBE will be ready for growth within the next month.  This system is currently equipped with an oxygen plasma source as well as high purity gallium, iron and a rod fed platinum e-beam source.  Initial research is geared toward exploration of advanced wide bandgap Ga2O3 semiconductors as well as Fe / Pt - magnetic epilayers with integrated Pt spin detectors for thermal spintronics.  Additionally, this chamber is connected in vacuum via a magnetic transfer system to another MBE chamber which grows plasma assisted nitrogen based semiconductors allowing integration of these materials without exposure to atmospheric conditions.  

Contact Mark Brenner for further info ( 

Riber M7 MBE chamber within the SEAL facility.